THE RAMADA HOTEL – SOLIHULL

OUR PROJECT

The Ramada Hotel – Solihull

Project Duration: 16 Weeks
Completed: March 2017
Value: £695,106.68
Scope: Full refurbishment of 36 bedrooms and ensuites

The design team were based in India and all the FF&E was shipped from China, making this a challenging project. The brief was to refurbish 36 bedrooms and ensuites over 2 floors. The rooms had a full mechanical and electrical package which had to be connected to existing systems. All bathrooms were tiled, and new sanitary ware was fitted to a bespoke design. Remaining operational, all works were completed with minimum disruption.

Gallery